Announcements
PPL Electric Default Service (Full Requirements) RFP - REMINDER: Submit Bids Between 10 a.m. – 12 p.m. (noon) EPT TODAY
The Bid Proposal Submission Window for the Default Service RFP is 10 a.m. – 12 p.m. (noon) EPT TODAY, July 28, 2026. All Bid Proposal Spreadsheets must be received by the PPL Electric RFP Team within the Bid Proposal Submission Window.
Your confidential information for submission of bid proposal is provided in Attachment 1 to your Notification of Qualification sent to you on July 17, 2026. Please ensure you have this information handy; you need this information for purposes of Bid Submission.
The last Bid Proposal Spreadsheet submitted for a product supersedes all previous submissions for that product.
In addition, please refer to the below FAQ highlighted for your information.
FR-Rules-FAQ-5. Can you please clarify what the Price (US$/MWh) within the Bid Proposal Spreadsheet indicates? How is the payment to a winning bidder calculated?
The “Price (US$/MWh)” column of the Bid Proposal Spreadsheet indicates the RFP Bidder’s price quote corresponding to the number of the Total Tranches Supplied in that row. An example is provided below for illustrative purposes only.
|
Total Tranches Supplied |
Price (US$/MWh) |
|
1 |
40.00 |
|
2 |
45.00 |
|
3 |
50.00 |
|
4 |
55.00 |
|
5 |
60.00 |
|
6 |
X |
|
7 |
X |
|
8 |
X |
Bidder ABC has submitted a complete Bid Proposal Spreadsheet for Residential – 24 Month Product. Bidder ABC has bid for a Total of One (1) Tranche Supplied at US$40/MWh, a Total of Two (2) Tranches Supplied at US$45/MWh, a Total of Three (3) Tranches Supplied at US$50/MWh, a Total of Four (4) Tranches Supplied at US$55/MWh, and a Total of Five (5) Tranches Supplied at US$60/MWh. Bidder ABC has marked an “X” for Six (6) Total Tranches Supplied to Eight (8) Total Tranches Supplied to indicate that they do not wish to bid on more than Five (5) Total Tranches Supplied.
CASE 1: Bidder ABC is awarded Two (2) Total Tranches Supplied. If Bidder ABC is awarded Two (2) Total Tranches Supplied for the Residential – 24 Month Product, Bidder ABC would be required to provide full requirements service to serve 5% (i.e., 2.5% * 2 Tranches) of Total Residential Default Service Load. Bidder ABC will be paid US$45 per MWh for each MWh of the hourly loss derated load associated with the supply.
CASE 2: Bidder ABC is awarded Four (4) Total Tranches Supplied. If Bidder ABC is awarded Four (4) Total Tranches Supplied for the Residential – 24 Month Product, Bidder ABC would be required to provide full requirements service to serve 10% (i.e., 2.5% * 4 Tranches) of Total Residential Default Service Load. Bidder ABC will be paid US$55 per MWh for each MWh of the hourly loss derated load associated with the supply.
